Month Two: Turn Up What Catches Demand
With the leaks closed, put more into the channels that reach people who are ready. If you'd rather not run the ads yourself, K&B Ads Agent is our done-for-you version, scored on booked estimates.
Build search campaigns around specific services. "Kitchen remodeling in [town]" and "bathroom renovation in [town]" are separate campaigns pointing at separate pages. A cabinet dealer adds "custom cabinets" and the brands it carries. Keep a list of searches you don't want, such as DIY, jobs and free plans.
Give each campaign its own page. The page repeats what the ad promised, shows two or three local projects, and offers one next step: book a design consultation.
Tell the ad platforms what a good result is. A form fill is a weak signal. When an inquiry becomes a booked estimate, record that back in the ad account as a conversion. The platform then looks for more people like the ones who booked.
Publish two pieces that answer buying questions. Good first choices are "what does a kitchen remodel cost in [town]," using your own job ranges, and "how long does a kitchen remodel take," using your own timeline.
At day 60, compare cost per booked estimate by source. Some will be far cheaper than others.
Month Three: Scale What Books, Cut What Doesn't
By now you have eight weeks of real numbers. Use them.
- Move budget toward the source with the lowest cost per booked estimate, as long as those estimates are closing. A cheap estimate that never signs is expensive.
- Cut or rework anything that produces inquiries but no estimates. Look at the search terms and the page before you blame the channel.
- Add retargeting. Show ads to people who visited your site and didn't book. This audience is small, so the spend is too.
- Test one Meta campaign. Use real project photos or a short walkthrough video, aimed at homeowners in your service area. Its job is to start demand, so judge it over a longer window than search.
- Plan the next 90 days from what you learned.
The Weekly Scoreboard
Thirty minutes, same day each week. One page, seven numbers:
- Spend
- Inquiries
- Qualified inquiries (right area, right kind of job, real budget)
- Booked estimates
- Estimates held
- Jobs signed
- Cost per booked estimate
Write last week's figures beside this week's. When a number moves, ask what changed in the step before it. Fewer booked estimates with the same number of inquiries is a follow-up problem. Fewer inquiries with the same spend is an ad or a page problem.
Clicks, impressions and followers aren't on the list. They're useful for diagnosing a problem, and they don't tell you whether the plan is working.
Follow-Up Systems to Have in Place
Four short sequences cover most of what gets dropped:
- New inquiry: call, then text, then email on the first day, with further attempts over the next two weeks.
- No-show: a same-day message offering two new times.
- After the estimate: a check-in a couple of days later, again at one week, three weeks and six weeks.
- Past clients: a note twice a year, and a referral ask after the job is finished.
Write the messages once. Keep them short and in your own voice.
Common Questions
How Much Should a Kitchen and Bath Company Spend on Marketing?
There's no single right figure. Work from the target instead: the number of booked estimates you need, multiplied by what a booked estimate costs you. If the total is more than the jobs can support, the fix is a lower cost per estimate or a better close rate, and month one shows you which.
Should I Run Google Ads or Meta First?
Search first if your budget is limited, because it reaches people already looking for a remodeler. Add Meta once search is producing estimates at a cost you're happy with.
What If I Only Have a Few Hours a Week for This?
Do month one and the scoreboard. Response time, reviews and the old estimate list need time more than money, and they usually pay back fastest.
How Soon Will I See Results?
Follow-up changes show up within days, because the inquiries already exist. Ads take a few weeks to settle. Content and local search take longer, which is why they start in month two and keep going.
Keep It on One Page
Write the target at the top, the four jobs in the middle and the seven numbers at the bottom. Review it weekly and rewrite it at day 90.
We run this kind of plan for one kitchen and bath company per area, and we report it as a scoreboard of booked estimates. The structure works just as well without us.