★★★★★

5.0 Google Rating

·

Green checkmark in circle

Google Verified

·

Replies within 1 business hour —

we time ourselves.

Home
/
 Blog
/

Lead Generation

Lead Generation

How to Build a Spring Pipeline in November and December While Other Kitchen and Bath Shops Go Quiet

Spring installs are sold in winter. A six-week plan to book estimates in November and December while other shops go quiet.

·

Most kitchen and bath shops treat mid-November to New Year as dead time. Ads get paused, the showroom runs short hours and nobody follows up on the estimates that went out in October. Then February arrives, the phone starts ringing, and everyone competes for the same homeowners at once.

The shops with full spring schedules did their selling in the winter. This post is the plan for doing that: how to work out what you need, what to do in the next six weeks and what to track.

Why Spring Jobs Are Sold in Winter

Work backwards from an install date and the timing explains itself.

A homeowner who wants a new kitchen by early summer has to get through several steps first: a first conversation, a measure, a design, revisions, selections, a signed contract, a cabinet order and the wait for those cabinets to arrive. Each step takes days or weeks. Cabinet lead times alone vary a lot by supplier and by line, so ask yours what they're quoting for January orders.

Add those steps up for your own shop. For most, a job that installs in April or May needs a signed contract in January or February. A contract in January needs a design in December and a first conversation in November or early December.

There's also a reason homeowners start looking now. The holidays put a lot of people in one kitchen. The drawer that sticks and the layout that doesn't work are harder to ignore with a house full of guests. Some of those homeowners start researching in the same week.

What Changes When Competitors Pause

Three things get easier when other shops go dark for the holidays.

Your ads face less competition. When fewer remodelers bid on the same searches in your area, your budget tends to go further. Check your own account rather than taking this on faith: compare cost per click and impression share for the last two weeks of December against October.

Your response stands out. A homeowner who fills in three forms on December 20 and hears back from one company has an easy decision about who to meet first.

Your calendar has room. Designers who are stretched in April have open mornings in December. A design consultation booked now gets more attention than one squeezed in during the rush.

Work Out the Number You Need

Before you spend anything, work out how many booked estimates the spring requires. Use your own figures. The numbers below are placeholders to show the arithmetic.

  1. Install capacity. How many kitchens and baths can your crews finish between March and June? Say 16.
  2. Already sold. How many of those slots are under contract? Say 5. That leaves 11 to sell.
  3. Close rate. Of the estimates you present, how many sign? If it's 1 in 3, you need 33 presented estimates.
  4. Show rate. Of the estimates you book, how many happen? If 9 in 10 show up, you need about 37 booked.
  5. Weeks available. If those contracts need to be signed by the end of February, you have roughly 14 weeks. That's 2 to 3 booked estimates a week.

That last number is the one to manage. "More leads" is vague. "Three booked estimates a week until the end of February" is something you can check every Friday.

If you don't know your close rate or show rate, that's the first thing to fix. Pull the last 12 months of estimates from your calendar and count.

Quick Check

Is your city still open?

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

One dealer per metro area. No commitment to check.

The Six-Week Plan

1. Open Your January Design Calendar Now

Give homeowners a reason to book in December for a January appointment. Publish the dates. "We have 12 design consultation slots in January" is specific and true, and it gives people a reason to act this week.

You don't need a discount. Offer a reserved production slot. A firm install date speaks to a worry many homeowners raise in the first conversation: a job that drags on. If you can truthfully say "contracts signed by January 31 install before June," say it.

2. Go Back Through Every Estimate From the Past 12 Months

This is the cheapest pipeline you have. These people already met you, and they already have a design or a number from you.

Sort them into three groups:

  • Said yes to someone else. Mark them and move on.
  • Said "not right now." Call them. Timing was the objection, and timing has changed.
  • Went silent. Send a short, plain message: "We're booking spring installs now. Is the kitchen still on your list for this year?"

Keep it to one call and two messages over two weeks. Log what they say. Even the "no" answers tell you why estimates don't close.

3. Keep Your Ads On, and Narrow Them

If you pause everything, you start from zero in January. A better move is to cut the budget on broad awareness and keep the campaigns that catch people who are searching for a remodeler now: your service plus your town.

Point those ads at a page that offers the January consultation, with the dates on it.

4. Cover the Phone Through the Holidays

A missed call on December 23 is still a missed call. Decide before the holidays:

  • Who answers, and during which hours
  • What the voicemail says, including when you'll call back
  • What happens to a call nobody picks up

A text that goes out within a minute of a missed call ("Sorry we missed you. This is Sam at Northside Kitchens. What are you thinking of doing?") keeps the conversation alive until someone can ring back. Update the holiday hours on your Google Business Profile too, so the listing doesn't send people to a locked door.

5. Ask Past Clients One Question

People who had a kitchen done by you two years ago are hosting in it this month. Their guests ask who did it. Send a short note: wish them well, and ask whether anyone they know is planning a project next year. One line is enough. Don't attach a brochure.

6. Publish One Page That Answers the Timing Question

Write a plain page titled something like "When to start planning a spring kitchen remodel in [your town]." Lay out your own timeline from first call to install, with honest ranges. Homeowners search for this in December, and a clear answer with real dates does more than a gallery.

The Winter Scoreboard

Pick a few numbers and look at them every week. These five cover it:

NumberWhat it tells you
Booked estimates this weekWhether you're on pace for the spring target
Show rateWhether the people booking are serious
Proposals outWhat's waiting on a decision
Contracts signedWhat's real
Weeks of backlogHow far out your next open install slot is

If booked estimates fall short for two weeks running, look at the step before it. Are fewer people inquiring, or are they inquiring and nobody is getting back to them in time?

Common Questions

Do Homeowners Really Shop for Kitchens in December?

Some do, and they tend to be planners. Check your own records: count the first-contact dates on last spring's signed jobs. If a good share started in November through January, you have your answer for your market.

Should I Pause Ads Between Christmas and New Year?

If nobody will answer inquiries that week, turn the ads down, because slow replies waste the spend. If someone will answer within the hour, leave them on. The week after Christmas is when a lot of people have time to research.

My Crews Are Booked Into March. Why Market Now?

Because the work you sell in December and January installs in April and May. Marketing has a delay built in. If you wait until the schedule has a gap, you fill the gap two months too late.

What If I Can't Offer a January Consultation?

Offer what you can deliver. A 15-minute phone call to talk through scope and budget still moves a homeowner one step forward, and it puts them on your calendar instead of a competitor's.

Where to Start This Week

Do the capacity math, pull the list of old estimates and decide who answers the phone over the holidays. Those three cost nothing. For numbers from other shops to compare against, see our Benchmark Report.

We work with one kitchen and bath company per area and measure everything by booked estimates, so this is the plan we'd run for a client in November. It works the same whether or not you ever talk to us.

The 60-Second Version

What this article covers, in four bullets

01.

Spring installs need a signed contract in January or February, so first conversations happen in November and December.

02.

Work back from install capacity, close rate and show rate to a weekly booked-estimate target.

03.

Open January consultation dates, call back the past year's estimates and keep narrow search ads running.

04.

Decide who answers the phone over the holidays, and track five numbers every week.

Eli Brown, founder of Kitchen Bath Marketing

Eli Brown

Founder, Kitchen Bath Marketing · Burnaby, BC

Eli Brown founded Kitchen Bath Marketing because owners kept paying for marketing they couldn't measure and leads they didn't own. He works only with kitchen and bath businesses, takes one dealer per area, and answers within one business hour. Text Eli: +1 (604) 842-8855

One Dealer Per Area

Your market might still be open.

We work with one cabinet dealer per metro area. Check if yours is available — no commitment, takes 10 seconds.

Your Area

Is your city still open?

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

One dealer per metro area. No commitment to check.